21 Moorfields
A regeneration project delivering two large office towers targeting a 15% reduction in embodied carbon.

Highlights
- MonitoringÌýall carbon emissionsÌýthroughoutÌýthe life of the building:ÌýLCAÌýmodulesÌýA1-A5, B1-B6, C1-C4Ìý
- Target 15% reduction inÌýembodiedÌýcarbonÌýat practical completionÌý–Ìý85,380 tonne CO2eÌý(1,335Ìýkg CO2e/m2);Ìýwhole life carbonÌý(60 yearÌýlifespan) has been calculated at 193,785 tonne CO2eÌý
- WRAP recycled content for the scheme is 19% – 21%.Ìý
Approaches Used
- TheÌýlifecycleÌýassessmentÌý(LCA)Ìýwas carried out in accordance with BS EN 15978, CEN/TC350 and EN 15804, and included embodied carbon impactsÌýassociated with the cradle-to-grave stages.Ìý
- The building sits on the existing slab of a demolished pre-existingÌý1960’s buildingÌýmaking the foundationÌýworks less onerous when comparedÌýtoÌýother similar central London buildings’ carbon footprint.Ìý
- A range of carbon reduction options covering architectural, services and structural components and systems will be generated.ÌýProposals include:Ìý
- TimberÌýcurtain walls,Ìýtimber internal frame,Ìý90%Ìýrecycled content aluminiumÌýexternal capping.Ìý
- LouvresÌýwith perforated blades (16% carbon footprint abatement against standardÌýairfoilÌýblades).ÌýÌý
- MetalÌýcladdingÌýelementsÌýwith lower carbon footprint.Ìý
- SuperstructureÌýsteelworkÌýwithÌýhigh recycled content.Ìý
- Steel reinforcementÌýwithÌýhigh recycled content,Ìýrebar with 98% recycled contentÌý–ÌýapproximatelyÌýtwo-thirds less carbon intensive than standard rebar.Ìý
- Alternative concrete mixes:ÌýÌý
- CoresÌýandÌýother structuralÌýconcrete elements:Ìýconcrete with 20-50% cement replacementÌýrecycled aggregateÌýÌý
- Piling:ÌýconcreteÌýwith 20-70% cement replacementÌýwith recycled aggregate.Ìý
- UpperÌýfloors:Ìýconcrete with 50% cement replacementÌýwith lightweight aggregate: e.g.ÌýLytag.
- To encourage the specification of building products withÌýanÌýEnvironmental Product Declaration (EPD).Ìý
- The project will includeÌýwhole life carbon benchmarkingÌýagainst other similar projects.Ìý
For Further Information:
Please contact: Ìýpress@wilkinsoneyre.com



Related members
Related
1 Triton Square
Office refurbishment focusing on the circular economy - maximising the retainment and reuse of materials.

11-21 Canal Reach – Meta Office
Two commercial office buildings under construction in Central London, including an embodied carbon reduction target.

2 Redman Place
Nine-storey office building in Stratford's International Quarter London, adopting innovative design and technical solutions to achieve BREEAM Outstanding and WELL Core & Shell Gold.

21 Moorfields
A regeneration project delivering two large office towers targeting a 15% reduction in embodied carbon.
